
Add to Cart
2019 New developed products outdoor P9.525 SMD3535 front access LED display
1, Our developed products outdoor p9.525 Nationstar SMD3535 led signs with front access.
Specification for outdoor P9.525mm LED signs
List | Item | Description |
1 | Pixel Pitch | 9.525mm |
2 | Module Size | 1*1F |
3 | Pixel Density | 11022/㎡ |
4 | Pixel composition | 1R1G1B |
5 | LED Type | SMD3535 |
6 | Module Resolution | 32*32 |
7 | Display Weight | 50Kg Water-proof |
8 | Service way | Front Access |
9 | Driving Method | 1/2 Scan Constant Current Driving |
10 | Frame Frequency | ≥60Hz/s |
11 | Refresh Rate | 200Hz/s |
12 | White Balance Luminance(CD/㎡) | ≥8000cd/㎡ |
13 | Operating Environment Temperature | -20℃—60℃ Optional |
14 | Operating Voltage | 110V±10% |
15 | Brightness Adjustment | 1024 grades of each color(R.G.B)can be adjusted manually and 16 levels of each color can be adjusted automatically |
16 | Input Signal | RF,S-Video RF, S-Vido, RGB, RGBHV, YUV etc. |
17 | Control System | Asynchronous controllor |
♦
Trade Terms
1. Packing: Anti-shaking wooden cabinet /Air flight case/carton
2. Shipping port: Shenzhen. China
3. Shipping freights are quoted according to your requests
4. Delivery time:5-25 working days
5. 2 years warranty, lifelong maintaining.
After-sale service
1. Our products have two years warranty service ,lifetime free maintenance and upgrade.
2.Complaint respond period not exceed 24 hours; maintenance guidance and problem solution supplied in 48 hours.
3. We offered training to our customer who includes operating and maintenance of our products.
4. In the Maintenance period of the LED screen body, free of all maintenance charges; After Maintenance period, only charge the material costs fees free of manual work fees.
5. Full set of documents free of charge, which including installation guidance, software operation manual, easy maintenance manual and control system software CD and so on.
6. If the users find any problem that cannot be solved, please contact with our company, we can response in 24 hours. In order to shorten the maintenance time, Our Company will deploy some spare parts such as power and chips etc.
.